Library

October 2025 Update

This one’s for members Our members library is where the real work lives: original technical content from the people who did the work, using materials and methods from the highest levels of the sport. Inside our Membership Site: Extended video walkthroughs from Paikea’s refit and our professional jobs New members videos uploaded regularly Downloads and

October 2025 Update Read More »

port fwd cabin ready for paint

Finishing the Stanchion Sockets: Load Paths, Peel Ply, and the Vacuum Bagging Process

Finishing the Stanchion Sockets: Load Paths, Peel Ply, and the Vacuum Bagging Process The last of the starboard side stanchion sockets went in during a genuinely hot stretch — air temperature around 32°C, laminating inside the hull with a portable air conditioner running flat out just to make the space workable. Not the most comfortable

Finishing the Stanchion Sockets: Load Paths, Peel Ply, and the Vacuum Bagging Process Read More »

Scroll to Top