Paikea’s front beam

Forestay Attachment and Wet Preg: Engineering the Pin Into a Carbon Longeron

Forestay Attachment and Wet Preg: Engineering the Pin Into a Carbon Longeron Attaching a forestay to a carbon longeron built from recycled mast sections isn’t a standard job. There are no off-the-shelf fittings for this configuration — the geometry is specific to this mast, this boat, and this longeron position. Shayne spent a lot of

Forestay Attachment and Wet Preg: Engineering the Pin Into a Carbon Longeron Read More »

Scroll to Top