Paikea Refit

Modifying our vintage Catana42 into a modern performance cruiser

Engineering Composite Flush Hatches: Why We Started From Scratch

Engineering Composite Flush Hatches: Why We Started From Scratch Paikea’s original hatches were thirty-two years old, genuinely well-built, and still failing in exactly the way expensive equipment fails when it’s finally reached the end of what it was designed for. What was actually wrong with them These aren’t cheap hatches. They’re proper offshore-spec units with […]

Engineering Composite Flush Hatches: Why We Started From Scratch Read More »

designing composite hatches

Finishing the Stanchion Sockets: Load Paths, Peel Ply, and the Vacuum Bagging Process

Finishing the Stanchion Sockets: Load Paths, Peel Ply, and the Vacuum Bagging Process The last of the starboard side stanchion sockets went in during a genuinely hot stretch — air temperature around 32°C, laminating inside the hull with a portable air conditioner running flat out just to make the space workable. Not the most comfortable

Finishing the Stanchion Sockets: Load Paths, Peel Ply, and the Vacuum Bagging Process Read More »

Scroll to Top